Today, rubber hit the road on the first table, or at least the top of the first table. We kicked off at 8:00 AM with a shopping trip to Lowes to pick up supplies (totaling a whopping $170, which we had the forethought to split between about 13 people). Then, everything was loaded into Matt's truck, driven at a brisk 20 mph to his house, unloaded, measured, sawed, and moved to the basement to be assembled.
Then the assembly. Twelve hours, three trips to Home Depot, and a trip to Wal-Mart later, the table top had been assembled, wood filler'ed, routed, sanded, sanded, sanded, then sanded some more, vacuumed, and stained and wiped. Pics or it didn't happen, right?
No comments:
Post a Comment